Example
Submitted piece:
In 1981, construction of the four-unit nuclear power plant in Mochovce
(now in the Czech Republic) was commenced, using VVER 440/213 reactor
units. With regard to conceptually non-clarified questions of the
automatic control of production processes and nuclear safety, the
completion of Unit 1, which was originally planned for 1985, has
been gradually postponed and the completion process was not finished
in time. Construction of Unit 1 and Unit 2 was completed in 1998,
in 2000 respectively. A further two units were originally envisaged
on the site. Work on Units 3 and 4 was started in 1986 and halted
in 1992. These units remain partly built and have been maintained.
Edited piece:
In 1981, construction of the four-unit nuclear power plant in Mochovce
(now in the Czech Republic) was begun, using VVER 440/213 reactor
units. With regard to conceptually unclear questions regarding the
automatic control of production processes and nuclear safety, completion
of Unit 1 (originally planned for 1985), was
continually postponed
and not finished on schedule. Construction of Units 1 and Unit 2
was completed in 1998 and 2000, respectively. A further two units
were originally planned on the site. Work on Units 3 and 4 was begun in 1986 and halted in 1992. These units remain partially built and
have been maintained.
Clean edited, with all tracked changes accepted:
In 1981, construction of the four-unit nuclear power plant in Mochovce
(now in the Czech Republic) was begun, using VVER 440/213 reactor
units. With regard to conceptually unclear questions regarding the
automatic control of production processes and nuclear safety, completion
of Unit 1 (originally planned for 1985), was continually postponed
and not finished on schedule. Construction of Units 1 and 2 was completed
in 1998 and 2000, respectively. A further two units were originally
planned on the site. Work on Units 3 and 4 was begun in 1986 and
halted in 1992. These units remain partially built and have been
maintained.
Send me a typical paragraph for a test-edit. Attach
a word document to an e-mail and please include an estimate of the
length of the work, as well as an estimated due-date. You can generally
expect a reply within 24 hours.
|